AI redesign based on the product photograph, prepared by Layla Mining; illustrative only. Final shipment specifications and appearance prevail.

The package and its current official name

Our listing title is ANTRACK V2 Package; BITMAIN's current product page identifies SPOT AR1903 and ANTRACK version AR21. The USD 3,916 price was checked on 7 October 2026. The listing starts on 29 September 2026; no closing date or confirmed stock quantity is supplied.

Four miners, one rack

Four S19 XP Hyd. units provide a typical 1,028 TH/s combined. Their combined typical power is 21,384 W. The rack's 24 kW miner-load and 26 kW total-load figures are capacity ratings, not actual consumption or efficiency. Actual hashrate and power vary.

How the cooling system works

A pump circulates coolant through the miners in a closed loop; an external fan-assisted cooler releases heat outdoors. Provide unobstructed airflow and service access. Connect Ethernet and configure the mining pool only after professional commissioning and the manufacturer's checks.

Site, electrical and coolant requirements

This is an industrial installation, not a normal household socket appliance. Supply is three-phase 380–415 V, 50–60 Hz. The listed 63 A input is not a breaker-sizing instruction. A qualified installer must verify contracted capacity, protection, grounding and local permissions.

Manufacturer limits include ambient −20 to 45°C, coolant inlet 20–40°C, circuit flow 32–40 L/min and pressure ≤3.5 bar. Cabinet specifications list 10% organic antifreeze and pH 7.8–8.5. Initial conductivity must be <20 µS/cm; replace fluid at ≥100 µS/cm. Follow the approved manual, not a DIY mixing guide.

Illustrative electricity budget

Assuming continuous 26 kW gives 624 kWh/day. At USD 0.03 / 0.05 / 0.07 / 0.10 per kWh, electricity alone is USD 18.72 / 31.20 / 43.68 / 62.40 daily. This capacity-based illustration is not measured consumption; actual bills vary. It excludes other costs and guarantees no earnings or payback.

Country examples: verify the individual site

Paraguay: require a utility-authorized mining or hosting contract; ANDE has a dedicated GCIE category.

Québec, Canada: confirm eligibility and capacity with Hydro-Québec; blockchain projects can have special conditions. Do not assume ordinary industrial rates apply.

Dubai, UAE: budget DEWA's slabs, fuel surcharge and VAT; verify outdoor cooling against the temperature limits above.

These are conditional examples, not guarantees of cheap electricity or regulatory approval.

Order, dispatch and warranty

BITMAIN lists dispatch within 20 working days after full payment—not arrival. Shipping is extra and confirmed by its sales team; customs and import obligations remain destination-dependent. Its stated 365-day warranty starts at shipping and applies to the original direct purchaser, subject to terms. Review current cancellation, refund and warranty restrictions before ordering.

Official sources and image disclosure

Confirm current specifications and purchase terms with BITMAIN, and site requirements with the relevant utility.

AI redesign based on the product photograph, prepared by Layla Mining; illustrative only. Final shipment specifications and appearance prevail.

BITMAIN — product and purchase terms

ANDE — GCIE mining category

Hydro-Québec — blockchain requirements

DEWA — tariff structure